- May 2017 Jiangyin Minghong second paint 2018-3-8
The Jiangyin Minghong second paint line was successfully completed and delivery on May 2017, which was designed、manufactured、and installed by us. This time the pint line used German standard,and manuf ...
- June 2017 Chongqing Volvo Bumper Paint L2018-2-26
In June 2017, the paint line designed and manufactured byJJM for BMPT was successfully put into production. The paint line was speciallybuilt to support the OEM of Volvo Car. The design and constructi ...
- September 2017 BMPT recirculation air sy2017-10-25
June2017, invited by BMPT, we started to transform the paint line’s air exhaustingsystem, after upgrading, we change the directly exhausting air system torecirculation air system, and add one RTO syst ...
- April 2016 Shenyang Daoda paint line suc2016-4-30
The paint line whichis designed、manufactured and installed byus, is successfully completed and passed acceptance by Shenyang Daoda. Thispaint line is specifically built for producing car grille produc ...
- January 2015 Shenyang Minghua oven and d2016-4-30
January 2015, we have upgrading successfully for the Shenyang Minghua paint line, by adding one oven before Basecoat spraying, the line has the function of spraying water-based paint now. ...
- March 2016 Wuhan Mingjie paint line prod2016-3-30
March 2016, we finished the productioncapacity improvement of paint line of Wuhan Mingjie, by upgrading conveyor、CC oven、and CC cooling etc., single skid product from two to three, thepaint line achie ...
- December 2015 Shanghai Mingchen paint li2015-12-31
From September 2013 to December 2015, invited byShanghai Mingchen, we are responsible for the upgrading to meet the requirementof Shanghai Environmental Protection. The spray booth is transformed from ...
- June 2015 BMPT conveyor of loading and u2015-7-30
June 2015, we are successfully finish the changing brackets and chains of the loading and unloading zone. After upgrading, the brackets and skids can be replaced on the second floor at the same time t ...
- September 2014 Jiangyin Minghong Paint l2014-10-6
September 2014, Jiangyin Minghong Pain Line build successfully, and Put into operation successfully. This line is cooperative development and construction by ASIS and us, there are 6 ABB robots on spr ...