May 2017 Jiangyin Minghong second paint line successful completion and delivery
The Jiangyin Minghong second paint line was successfully completed and delivery on May 2017, which was designed、manufactured、and installed by us. This time the pint line used German standard,and manufactured in China, also had the Domestic price. The line product qualification rate will be not less than 90%, the initial design annual capacity of 1.4 million spoiler, grille 1.85 million, and later by increasing the annual capacity of robots increased to 2.15 million spoilers, 2.88 million grid.
|
|
| TIME: 2018.03.08 VIEW: